Shared by:SophieNYC

The Critical Series, Book 2 - Darren Wearmouth, Colin F. Barnes

Written by
Read by Luke Daniels
Format: M4B
Bitrate: 64 Kbps
Unabridged

Length: 10 hrs and 1 min
Series: The Critical Series, Book 2
Unabridged Audiobook
Release Date:02-02-16

Destroying the croatoan's seat of power has grave consequences. Earth faces destruction unless bitter enemies can work together.

Earth is recovering after Denver and his group managed to stamp out the immediate alien threat. Now Denver and his team, stationed in a liberated croatoan farm, plan to restore humanity as the dominant force. But when shocking information comes to light, they set off on an immediate mission north.

The team encounter a hybrid city where humans and croatoans live and work together. It's here in this strange new civilization that Denver discovers there's a bigger threat to the planet than the aliens already on the surface: Something far more terrible is coming. It'll be a race against the clock to defeat this new threat, and Denver will need all the help he can get.

Announce URL:udp://open.demonii.com:1337/announce
This Torrent also has several backup trackers
Tracker:udp://open.demonii.com:1337/announce
Tracker:udp://open.demonii.com:1337/announce
Info Hash:307947f3a5bafae0e4d0a8d5b106f1cd3c6b107a
Creation Date:Wed, 02 Mar 2016 04:01:13 +0000
This is a Multifile Torrent
Critical Path The Critical Series, Book 2 (Unabridged).cue 2.33 KBs
Critical Path The Critical Series, Book 2 (Unabridged).jpg 44.91 KBs
Critical Path The Critical Series, Book 2 (Unabridged).m4b 270.37 MBs
Combined File Size:270.42 MBs
Piece Size:512 KBs
Comment: (Audible -2016)
Torrent Encoding:UTF-8
Seeds:48
Peers:8
Completed Downloads:106
Torrent Download:Torrent Free Downloads
Tips:Sometimes the torrent health info isn't accurate, so you can download the file and check it out or try the following downloads.
Direct Download:Download Files Now
Tips:You could try out the alternative usenet.nl client.
High Speed Download:Unlimited Speed Download
Ads: 14 days trial